Pulp Washer Drums Major Refurbishment
AIE undertook major repairs on CHH Tasmans Washer 15, 25 and 65 drums.
Prior vacuum sealing problems and oil leaks had justified the total refurbishment of these drums within a short time frame of 25 days.
Once again AIE worked around the clock to strip the drums, trunnions and gearboxes and totally refurbish them.
The biggest of the drums was 5m in dia and 8m long.
|